| "Impacting Today's Roads for a Safer Tomorrow" |
|
| |
| |

|
|
FOR BEST RESULTS USE IMPACT RECOVERY SYSTEMS TWO-PART EPOXY
Part #160 Two Gallon Epoxy Kit (installs apx. 15 bases)
Part #161 Ten Gallon Epoxy Kit (installs apx. 75 bases)
|
- Check bottom of fixed base for tape covering T-Nuts. Tape prevents epoxy from entering screw threads upon installation.
- Pavement surface should be clean and dry.
- Mix part A and part B of epoxy equally and follow instructions on epoxy container. Use 8 to 10 oz. of part A and 8 to 10 oz. of part B per base.
- Align base with arrows facing traffic and push into epoxy. Rotate base 90 degrees and back, filling underside channels and holes in base with epoxy.
- Epoxy should extend around sides of fixed base.
- Allow epoxy to dry 24 hours for optimum performance.
- Place post into base, check for proper alignment.
- Hand tighten all four socket cap screws, and then tighten with 5/16 allen wrench until snug.
|
| |
|
|
|
4955 Stout Dr.
San Antonio, TX 78219
(210) 736-4477
(210) 734-6448 Fax
(800) 736-5256
|
|
|
|
|
|