1. Layout and mark final location using the base as a guide. Ensure two anchors slots are facing towards the most common direction of impact. Note: Keep the bollard 0.32 x height away from any solid object to allow for tilting.
2. Remove base and drill four 5/8” holes, 4” deep. Clean out the concrete dust from the holes.
3. Place the elastomer in the center of the location.
4. Place the adapter centered on top of the elastomer so that the set screws are facing the direction of impact.
5. Fit base over the adapter so that it rests on the adapter flange and covers the elastomer.
6. Hand tighten all four anchors slightly into their holes. Ensure that the base anchor slots are evenly aligned with the anchors.
7. Tighten the concrete screw Anchors in a star pattern, compressing the elastomer and making the base flush to the concrete. Anchor heads must be tightened firmly, flush to base. TORQUE SPEC: 85 ft-lb
8. Insert the pipe into the adapter.
9. Firmly tighten all set screws to hold the bollard pipe in place. TORQUE SPEC: 50 ft-lb
U.S. Office
Business Hours:
Monday – Friday
7:30am – 4pm
U.S. Central Time Zone
E.U. Office
Business Hours:
Monday – Friday
8am – 5pm (17.00)
European Time Zone
KMO Unit Ever Green
Nieuwlandlaan 111, Unit 001
B – 3200 Aarschot
©2024 Impact Recovery Systems, Inc.® All rights reserved. Impact Recovery Systems, IRS, One Base, and Tuff Curb are registered trademarks of Impact Recovery Systems, Inc.® SlowStop® is a registered trademark of SlowStop Guarding Systems, LLC.®
The products illustrated or described on this website are covered by the following U.S. and International patent numbers: 7,195,422 | 7,621,691| D937,700 | D620,823 | D620,824 |D620,825
EP 2 267 225 | EP 2 888 412 | 9,938,677 | 11,136,735 | D932,875. Other U.S. and International patents pending.
This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our policy. Read more